Vehicle, Asset & Job Roster Administration
Automated SIC Dispatch • Real-Time Hourly Plan vs Actual • 40-Equipment Fleet Status Ledger • Upcoming Shift Face Planning • DGMS Statutory Handover
Select authenticated operational role
SHIFT B (16:00 - 00:00) • TARGET 51T → 60T METAL/YR/PERSON • HZL ZAWARMALA COMPLEX
Baseline: 51.0 T • Target: 60.0 T (+17.6% lift via Short Interval Control & Predictive Fleet Availability)
Live operational variance vs. HZL Hackathon secondary KPI targets.
Record failure reason, downtime minutes, ETR, and set machine status to OK, Idle, Breakdown, GC Due, or Maintenance.
11 LPDTs, 7 LHDs, 8 Drills, 8 Utilities/Services & 6 Additional Vehicles.
| CODE | CATEGORY | MODEL & OEM | CAPACITY | LEVEL | STATUS | STATUS REASON / FAULT DETAILS | GC DUE DATE | OPERATOR | ACTION |
|---|
| LOG ID | MACHINE | EVENT TYPE | REASON & ROOT CAUSE | DOWNTIME | ETR | SEVERITY | ESCALATION | REPORTED BY | ACTION |
|---|
Target specific heading faces (430-DEV-01, 418-EXT-02, 250-DRIVE-R, -130-WEST-04, etc.), allocate 40-HEMM fleet assets, and plan advance meters & tonnage targets for upcoming Shift C (00:00 - 08:00).
Assign face heading, machine, operator, and planned advance metrics.
| PRIORITY | TASK TITLE | TARGET FACE / LOCATION | ASSIGNED MACHINE | ASSIGNED OPERATOR | TARGET METRICS | STATUS |
|---|
Tonnage lost across mining value chain bottlenecks before Short Interval Intervention.
MJ-5, EMT-6, SL-1 repairs
CL-19 stall @ 228 mRL
Primary feeder plate obstruction
Operator fatigue lockouts
Cleared faces awaiting LHD
Automated alerting on faces cleared of blast fumes but lacking mucking/drilling assets.
| HEADING / LEVEL | CYCLE STAGE | ASSIGNED MACHINE | STATUTORY MATE | PROGRESS | UTILIZATION STATUS |
|---|
Starvation warning threshold < 35%
Probability of hitting 2,100 T shift plan
Target benchmark > 95%
Divert haulers GT 10 & EMT-1 to 265 mRL stope (Loader GL-8 active). Deploy gas-cutter Munna (800110) to clear crusher rockbolt. Recovers +4.8T metal yield to drive takt to 58.6 T/person/yr.
Shift B (16:00 - 00:00) interval production run-rate with automated bottleneck tagging.
| INTERVAL | HOURLY PLAN | ACTUAL TONNES | VARIANCE | BOTTLENECK IDENTIFIED | AI RECOVERY WORK ORDER |
|---|
Tasks ranked P1 to P4. Workers must be confirmed INSIDE MINE via portal turnstile RFID. Short-punch and high-fatigue operators are auto-restricted from hazardous teleremote rigs.
| PRIORITY | TASK TITLE | LEVEL | MACHINE / BEAT | ROLE REQUIRED | ASSIGNED WORKER (EDITABLE) | ACTION |
|---|
Parse shift parameters from underground field group broadcasts.
Shift A (08-16h), B (16-00h), C (00-08h) • Auto-locks 1 hr post shift end.
| SHIFT INTERVAL | OPERATING HOURS | 1-HR LOCKOUT EXPIRY | MUCKED TONNES | DRILLED METERS | REPORTED BY | LOCKOUT STATUS |
|---|
Individual short-punch hours lost, teleremote disqualification status, and tonnage benchmarking.
| TOKEN NO | WORKER NAME | CATEGORY | RFID GATE | FATIGUE STATUS | PRODUCTIVITY ATTRIBUTION | ASSIGNED BEAT / RIG | GATE STATUS |
|---|
Micro-delay progression and prescriptive recovery work orders.
Single-lane decline clearance control and right-of-way management.
Yielding right-of-way to ascending loaded hauler MT-5.
Clearance bypass established around broken loader CL-19.
Speed: 14 km/h | Engine: 1,800 RPM | Gradient: 1:7 Incline.
Active CAN telemetry reliability stats across GHH, Epiroc, Gainwell, Sandvik, AAC & Normet.
One-click compliance reporting with verified Mining Mate statutory beats.
Connected to Gemini. Dispatch complex multi-asset work orders and resolve underground operational constraints.